• The second phase of the Itivia Project is the construction of the fuel farm
  • Agnico will construct 2 fuel tanks store 13 million litres of fuel
  • The fuel will then be transported to the mine site.
  • The construction of the Itivia fuel farm area requires drilling and blasting to set the tanks on solid bedrocks